3C Waste Ltd – Danes Moss L.F.S.

£200,000.00

Excavation and installation of gas collection works

A&V Croaker Ltd – Petrol filling station, Manchester

£24,000.00

Hydrocarbon interceptor trench with hydrocarbon resistant membrane and geocomposite vent blanket

Alfred McAlpine – Robin Park Stadium, Wigan

£264,000.00

Installation of gas protection membrane and active venting works to stadium complex

Alfred McAlpine – Robin Park Stadium, Wigan

£72,000.00

Design and build external works ventilation system to compliment building protection works

Alfred McAlpine Ltd – 5 aside soccer centre, Robin Park, Wigan

£170,000.00

Installation of gas protection membrane and full blanket detection and active intervention

Alfred McAlpine Special Projects – Sonae, Knowsley

£215,400.00

Supply and install gas resistant membrane and passive gas dispersal system

Amec / McAlpine J.V. – M65

£100,000.00

Excavation and installation of landfill gas cut-off trench

Anglo Holt - Trvelodge, Derby £32,000.00 Active gas protection system with internal monitoring and detection

Ashton Golf Club

£14,000.00

Installation of new pumping station, rising main and connection to Local Authority Sewer

Balfour Beatty – Dearne Valley, Rotherham

£50,000.00

Installation of fully welded gas protection membrane

Barnfield Construction - Shuttleworth Meads, Padiham, Burnley £84,000.00 Design, supply and install stormwater management system incorporating 300cu.m of attenuation

Barton Grange Landscapes – CRS Homestyle development, Rochdale

£50,000.00

3D cellular confinement system

Bechtel – Hillhouse STW, Southport

£450,000.00

New inlet works and associated primary screens

Bellway Homes – Herrison Village, Dorchester

£29,480.00

Capping of contaminated material 10000sq.m

Biffa Waste Services Ltd - Withnell

£120,000.00

New macadam access road

Biomass Ltd – Peterborough

£280,000.00

Construction of waste digestion plant

Birch Construction Ltd – Pride Park, Derby

£25,000.00

Supply and installation of gas protection membrane

Birse Properties - Warrington

£100,000.00

Construction of new access road including associated concrete and clay drainage

Biwater International Ltd – Tophill Low WTW

£5,000.00

Supply and installation of 2km fibre optic cable for video link

Bolton MBC – Spa Road

£12,000.00

Detention tank flow control and up-grade

Bowmer & Kirkland - Sainsbury's Distribution Warehouse, Stoke on Trent £450,000.00 Passive gas protection measures to new 50,000sq.m warehouse.

Bowmer & Kirkland – Tesco extension, Loughborough

£52,400.00

Alternative design supply and installation of gas protection measures

ConceptDevelopments - Trowells Lane, Derby £197,000.00 462ln.m/6m deep gas barrier and vent trench

Clugstone Constr. – Bran Sands ETW, Teeside

£25,000.00

Installation of extrusion welded gas protection membrane

Dawn Constr. – New Safeways @ Glasgow

£215,000.00

Installation of landfill gas cut-off trench and gas protection membrane and active underslab ventilation

Dean & Dyball – Kemsley Mill, Kent

£58,000.00

Re-lining of effluent aeration lagoon

Derwent Valley Construction / CIRIA – New community centre, Derby

£28,000.00

Sustainable urban drainage and storm water re-use system

Fairclough Homes - Fulwood Road, Preston £15,000 Virtual curtain gas interception and dispersal system

Fairveiw Homes – Slough

£26,000.00

Excavation and installation gas cut-off trench

FLI International – Superquinn, Waterford, Ireland

£139,250.00

Passive ventilation with active assistance via internal monitoring and detection system, and installation gas resistant membrane

Grant Construction Ltd – Mainette factory, Hawick

£80,000.00

Passive underslab ventilation, fully welded gas resistant membrane and external works ventilation

Halls Fire Protection Hercules Ltd – Salford

£13,000.00

Installation of fusion welded HDPE fire hydrant main

Harwood Homes - Councillor Lane, Cheadle £20,000.00 Passive gas protection measures to new residential development
Harwood Homes - Field Lane, Litherland £20,000.00 Embankment drainage and stabilisation works incorporating Geoweb containment system.
HBG - Arcadia, Heathrow £65,000.00 Supply and install 512cu.m Wavin stormwater management system
HBG - Bridge Road, Chertsey £3000,00 Supply and install prefabricated stormwater attenuation tank
HBG - New Town Road, Worcester £56,000.00 Supply and install 350cu.m attenuation system

HBG Higgs & Hill Ltd – B&Q, Wednesbury

£65,100.00

Installation of fully welded gas protection membrane

HBG Higgs & Hill Midlands Ltd – Aqueous II, Birmingham

£24,000.00

Fully welded gas protection membrane

HBG Higgs & Hill Midlands Ltd – New B&Q, Halesowen

£107,480.00

Design and build passive ventilation system with gas resistant membrane and internal monitoring and detection

Henry Jones - David Lloyd Club, Port Solent £545,000.00 Active gas protection system and design, supply and install vertical gas barrier system installed 6m b.g.l.
Holden Homes - Preston £20,000.00 Design, supply and install virtual curtain gas interception, dilution and dispersal system to gas migration across site boundary
Kilco Builders - Grazeley £6000.00 Supply and install Wavin stormwater management system

Lancashire Waste Services Ltd – Henthorne

£7,500.00

New surface water drain

Lancashire Waste Services Ltd – Much Hoole

£38,000.00

Rising main and pumping station

Lancashire Waste Services Ltd – Much Hoole

£250,000.00

Perimeter seal and drain

Lancashire Waste Services Ltd – Saltayre

£10,000.00

Cable ducts and cabinets

Lancashire Waste Services Ltd – Saltayre L.F.S.

£145,000.00

Perimeter leachate drain

Lancashire Waste Services Ltd – Whinney Hill

£280,000.00

Construction of new refuse waste cell and leachate treatment works

Lancashire Waste Services Ltd – Whinney Hill L.F.S.

£45,000.00

Installation of leachate pumping system

Lancashire Waste Services Ltd –Ulnes Walton L.F.S.

£406,304.00

Construction of new cell for the next phase of landfill site including leachate lagoon liner

Leigh RLFC – Leigh

£85,000.00

Excavation and installation of new floodlighting columns

Linkester Fire Protection Ltd – EVC, Thornton,

£46,000.00

Supply and installation of HDPE fire main

 

Miller Construction Ltd – Wigan

£350,000.00

Installation of gas protection for retail units

 

Morgan PLC – Irlam

£30,000.00

Installation of gas protection membrane

 

Morrison Construction Ltd – Hamilton Leisure Centre

£50,000.00

Installation of gas protection membrane

Moss Construction - Birmingham £26,000.00 Supply and install Alderburgh Atlantis stormwater management system
North West Water - Accrington £10,000.00 Construct breach in reservoir utilising Geoweb containment system

Norwest Holst – Pride Park, Derby

£130,000.00

Design and build full blanket ventilation and fully welded gas resistant membrane

Pellikaan Constr. – Nottingham Health and Raquets Centre

£44,700.00

Installation of gas protection / collection system

PJ Carey – New Homebase and non-food retail development, Greenwich

£150,000.00

Design, supply and install gas resistant membrane and passive gas dispersal system

PJ Carey – New Sainsbury’s Millenium Store, Greenwich

£221,800.00

Fully welded gas protection membrane and passive ventilation system

PJ Carey – Sainsbury’s extension, Chichester

£20,000.00

Installation of fully welded gas protection membrane and venting system with potential active upgrade facility

PJ Carey – Wheathampstead

£30,000.00

Installation of fully welded membrane for reed bed liner

Pochin D&B – Preston

£50,000.00

Installation of gas protection membrane

Posford Duvivier – Petrol filling station, Lincs

£29,000.00

Perimeter vent trench and gas collection installation

Railtrack – Chester LMD

£10,250.00

Hydrocarbon resistant extension to cut-off trench

Rentokil – Kirkby

£14,000.00

Installation of HDPE effluent and fire hydrant main

Scarisbrick Hall School

£55,000.00

Excavation and installation of pumped and gravity foul water system

Schall Ltd – New Sainsbury,s @ Leigh

£41,000.00

Installation of gas protection membrane

Sir Robert McAlpine – National Space Science Centre, Leicester

£130,600.00

Perimeter gas intersection, gas cut-off venting trench

Tarmac Ltd – A5 Simpson, Milton Keynes

£57,000.00

Installation of bridge deck drainage channels

UK Waste - Rainford

£77,000.00

Excavation and installation of HDPE leachate and gas collection pipework

UK Waste Ltd – Risley IV LFS £60,000.00 Supply and installation of gas and leachate collection pipework
Wimpey Homes - Verwood £22,000.00 Supply and install Wavin stormwater balancing tanks

Wimpey Holdings PLC - Erith, Kent

£45,000.00

Supply and install XR5 hydrocarbon resistant membrane encapsulation to Wavin stormwater system.